- Minimum Building or Plumbing Permit fee
- $150.00
- Permit fee based on percent of Value of Work
- 1.10%
- Mobile Home/Manufactured Home Permit fee
- $250.00
- Additional fee to move a Mobile Home/Manufactured Home located within the municipality to another location within the municipality
- $150.00
- Building moving Permit fee (within the municipality)
- $300.00
- Driveway Access Permit fee
- $50.00
- Pre-Building Permit Excavation fee
- $100.00
- Double Permit fee – For any work for which a permit is required has begun before a permit has been issued.
- Permit fee x2